Biota! Silvertown Aquarium

Biota! was a proposed aquarium in the Silvertown Quays redevelopment, on the site of Millennium Mills adjacent to the Royal Victoria Dock. It formed part of the wider Thames Gateway regeneration project for East London. Biota! would have formed one of the main public attractions in the 60-acre (24 ha), £1.5 billion development, along with Silvertown Venture Xtreme an extreme sports and surf centre.

Biota! was to be operated by the Zoological Society of London and would have been the world's first aquarium entirely based on the principles of conservation. The design for the aquarium incorporated four biomes, each representing an entire ecosystem. The £80 million aquarium building designed by Farrells was given outline planning permission in March 2005 and was initially expected to be completed in 2008, but the project was cancelled in 2009.

Project Partners:
Client: Silvertown Quays Limited
Main Contractor: Quintain
Engineers: WS Atkins, Hoare Lea, ARUP
Architects: Patel Taylor

Birmingham - Brindley Place

Brindley Place, Birmingham. Master Plan 1990.

Farrell was responsible for the Masterplan and also designed the Crescent Theatre within the Brindley Place site, on Sheepcote Street (completed 1998 with John Chatwin).

Bishops Gate Goodsyard

Landowners of Railtrack PLC wanted to appoint a masterplanner/architect to develop a disused railways goods yard. It is unclear whether Terry Farrell and Partners were appointed or if the project was eventually executed.

Project Partners:
Faulkner Brown
Hoare Lea

Blindwells

A third ‘new town’ masterplan for the outskirts of Edinburgh in addition to calderwood and south east wedge.

Project Partners:
Engineers: Faber Maunsell
Consultants: Wardell Armstrong

Bloomsbury Street Development

Material for this project is also known by the title ‘Bloomsbury Urban Realm Analysis’. The known project dates cover 2005-2006. In terms of chronology, it coincides with UCL’s development of the hospital site, but is a separate project. Farrells were employed to deliver a ‘strategic vision’ aimed to assist in identifying future masterplan proposals for the area, and provide a context for various initiatives pursued by interested parties.

The brief was to examine options for improvements to the urban realm in the area bounded by Euston Road, Tottenham Court Road, New Oxford Street / Bloomsbury Way and Southampton Row / Woburn Place. The scope of the brief also included the re-assessment of patterns of traffic, pedestrian and public transport movement. The resulting vision was required to take into account work already commissioned on traffic flows around the Euston underpass, specifically the re-introduction of two-way working along part of Tottenham Court Road and Gower Street, the introduction of a bus contra-flow along sections of Tottenham Court Road and the re-design of the main Euston Road junctions. The resulting scoping study produced the ‘Strategic Urban Realm Plan.’

Construction Partners:
Project Managers: M3 Consulting

Bluewater Valley West Masterplan

From c. 1998 to 2000, Terry Farrell and Partners with client, Lend Lease, worked together to develop a masterplan for a mixed use development in the Bluewater Valley west site, a quarry to the east of the Bluewater shopping centre. The client’s brief was to bring forward development plans for the initial phases of Bluewater Valley West, taking into account plans for further development at Bluewater shopping centre.

Construction Partners:
Building Materials Supplier: Blue Water Industries Plc

BMW, Bracknell

In May 1978 BMW began negotiations with Wiltshiers for the design and construction of their new UK headquarters and parts distribution centre. It was decided that Bracknell New Town fulfilled the requirements for the new BMW headquarters, made even more attractive by Wiltshier’s property development experience in the area.
To meet BMW’s brief for a high quality building reflective of their corporate identity to be built within a short timeframe, Wiltshiers invited Farrell Grimshaw Partnership to re-unite the design team responsible for the earlier Herman-Miller factor building project at Bath. Full occupation of the building by December 1979 was essential to allow full operation from 1st January 1980.

In view of the time-scale, and to minimise any delays arising in industries fringing the construction area, it was decided to adopt a structural solution based on a dry envelope, with a high element of offsite fabrication. Steel was therefore chosen for the structural frame and the cladding support framework. An economic design was arrived at for all the buildings using one basic column size and two beam sizes for the warehouse and link block, and one beam and one column for the office block. A single cladding system using white pre-finished, maintenance-free, and interchangeable Alucobond panels was used for the whole development.

In the final design the offices overlooked two landscaped courtyards, bordered by a mixed used area which included the restaurant, showroom, car workshops and computer room.

Cambourne

Cambourne was a projected new village in Cambridgeshire, on 400 acres of agricultural land 14 km east of Cambridge, planned and approved to relieve the pressure on Cambridge and its green belt. An outline consent for the scheme was granted in 1994 and the masterplan published in 1995. Planning permission for the final scheme was granted in 1996 and construction began in 1998.

The final masterplan was created by Terry Farrell & Partners. The masterplan divided development into 10 distinct phases with defined numbers of house quotas per phase, along with phased incorporation of access routes, schools, convenient retail establishments and infrastructure facilities. However the architectural style was deliberately pluralist, and seven firms of architects contributed to different parts of the scheme, including CZWG, Weston Williamson, Robert Adam, and Panter Hudspith. The plan created 3300 homes, a third of which would be social housing, plus schools, shops, offices, a church, library, and manor house hotel.

The scheme responded to both landscape and environmental factors, and a published landscape assessment demonstrated how the firm had determined the suitability of different parts of the site for development and areas of landscape of greatest potential as open space.

Construction Partners:
Building Company: Countryside Properties PLC

Canary Wharf

In 1998-1999, Terry Farrell and Partners were involved in a project to design the WF9 Building at the Canary Wharf development on 15 Westferry Circus. 15 Westferry Circus was a 9 storey, 16,250 m2 (174,900 sq ft) building located on the upper level of Westferry Circus, Canary Wharf. This was to be a speculative shell and core office tower block acting as a 'gateway building' to West India Avenue and the Canary Wharf development. Construction began in November 1998, when finished it marked the completion of the Westferry Complex.

Construction Partners:
Main Contractor: Canary Wharf Contractors