Identity area
Reference code
Title
Date(s)
- 2001-2004 (Creation)
Level of description
Subseries
Extent and medium
23 Boxes, Rolls TBC
Context area
Name of creator
Content and structure area
Scope and content
The masterplan for the Paddington Basin area was initiated in 1998 with a focus on 'The Point' building as the Orange phone company headquarters. Orange decied not to occupy the building in November 2002, however the overall masterplan continued to ... Read more
System of arrangement
Separated by large format drawing rolls, and document boxes. Original order imposed by Farrells filing system has been maintained.
Conditions of access and use area
Conditions governing access
Open with some restrictions: data protection researcher interview may be required. Special Collections staff will provide researchers with further details of these restrictions.
Conditions governing reproduction
Copyright Law Applies
Language of material
- English
Physical characteristics and technical requirements
Rolled drawings and plans; paper documents
Allied materials area
Description control area
Status
Draft
Level of detail
Full