Showing 39079 results

Archival description
Print preview Hierarchy View:

First Proof

Consists of a proof with annotations highlighting print error and some pages are out of sequence.

First Submission

Consists of a printout with the label "New Poems". There are some revisions attached with post-it notes written by Stewart Conn.

First Submission and As Built Working Drawings File, February 1993 - January 1999

A large collection of working drawings for Kowloon Station, contract 503B for the South Tunnels and Ancillary Buildings, drawing refs: 503B/W/01/TFH/A20 - A68; 503/Z/03/TFH/A71 - 78. Revisions A-C. Includes platform level and structural details and material specifications. There are also miscellaneous sketches and 'meanwhile use' drawings.

Results 9281 to 9290 of 39079