Showing 37997 results

Archival description
Print preview Hierarchy View:

Entrance Profiles and Shop Fit Out Drawings File, 16 April 1984 - 17 April 1985

A collection of working drawings for phases of the Comyn Ching Triangle development. These include Passage way plans CC1/K/101- CC1/K/136; Entrance porch details, shop front fit out, shop front sections and internal elevations with drawing ref of: CC1or CC2A/406- /909. Includes revision A for some drawings; Size: 850mm x 600mm Material: Transparent paper. Contains 15 items. There is also one drawing for new elevations at Monmouth and Shelton streets dated February 1981, Drawing ref: CC69 that doesn't appear to fit with the other drawing sequences.

Results 7681 to 7690 of 37997