Showing 39079 results

Archival description
Print preview Hierarchy View:

Design Notes and Development Sketches File, May - June 2006

Within original filing system as follows: Thames Gateway / TGATE / 01.02 Design Notes, Development Sketches; Items 3-5 correspond to information leaflet design; item 6 is a numbered set of short storyboard ideas; items 7-10 are Thames Gateway sketches; items 11 are labelled as Terry Farrell illustrations; items 12-13 are notes; items 14-72 are Thames Gateway sketches.

Design Notes File, 2005

Contains research and correspondence for the production of the Ouseburn Gateway design statement. Within original filing system as follows: Newcastle Quayside / NH4 / Design Notes / 01.02.

Design Report File, 1997-2000

Contains:
Sketch Study Report (Draft), undated.
South Kensington Station Scheme Drawings, Terry Farrell and Company, February 1997.
South Kensington Station, Stanhope, December 1997.
South Kensington Station Stage A Inception Design Review 1 Report, Terry Farrell and Partners, June 1998.
South Kensington Station Works, Davis Langdon and Everest, August 1998.
South Kensington Station Raft and Station Feasibility Study, Terry Farrell and Partners, 12 August 1998.
South Kensington Rights of Light, Terry Farrell and Partners, 13 October 1998.
South Kensington Station Summary of Schemes, 27 April 1999.
South Kensington Station Minimum Infrastructure Scheme for Stanhope, Terry Farrell and Partners, June 1999.
South Kensington Scheme Proposals, Terry Farrell and Partners, March 2000.

Results 6321 to 6330 of 39079