Showing 39079 results

Archival description
Print preview Hierarchy View:

Construction Drawings for Newcastle Quayside Phase 2 Development Works, Retaining Wall 'D' and Associated Highway, August - September 1993

A collection of construction drawings for existing ground survey, services and drainage, along with proposed changes to foul and surface water drainage plans. Also included are proposed changes to carriageway and wall levels, including St Ann's, Grain and Bin Warehouse foundations, elevations and cross sections. Drawings refs are 40162/211A series.

Construction Drawings, 1992-1994

Working Drawings for construction, including sit plans and layouts, floor plans, floor plan general arrangements, shop front isometric projections, and render, finishes and tiling drawings. 24 items from drawing series 5783/A/070-139.
Size: 720mm x 1000mm and 890mm x 1270mm.

Results 4381 to 4390 of 39079